Please use this identifier to cite or link to this item:
http://hdl.handle.net/1893/9192
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Noroozi, Asghar | en_UK |
dc.contributor.author | Oraee, Kazem | en_UK |
dc.contributor.author | Javadi, Mehrdad | en_UK |
dc.contributor.author | Goshtasbi, Kamran | en_UK |
dc.contributor.author | Khodadady, Hosein | en_UK |
dc.date.accessioned | 2015-12-18T01:03:17Z | - |
dc.date.available | 2015-12-18T01:03:17Z | - |
dc.date.issued | 2012-03 | en_UK |
dc.identifier.uri | http://hdl.handle.net/1893/9192 | - |
dc.description.abstract | Nowadays, the longwall mining is one of the most prevalent methods being used in coal mines. For the safety and success of such mines, one of the most important parameters is determination of the periodic roof weighting interval. As a matter of fact periodic roof weighting interval (PRWI) is not selected. Design and selection of support in this mining method should be correctly selected considering PRWI. Consequently, the current paper tries to develop a new model for determining the periodic roof weighting interval of coal mines. For this, the roof weighting interval is modeled by applying an analytical method and presented a model for determining the roof weighting interval. The results are compared with some case studies at coal mines. It is found that that the proposed model can confidently be used for determining the roof weighting interval in coal mines. | en_UK |
dc.language.iso | en | en_UK |
dc.publisher | Hacettepe University | en_UK |
dc.relation | Noroozi A, Oraee K, Javadi M, Goshtasbi K & Khodadady H (2012) A Model for Determining the Breaking Characteristics of Immediate Roof in Longwall Mines. Yerbilimleri: An Earth Sciences Journal, 33 (2), pp. 193-204. http://www.yerbilimleri.hacettepe.edu.tr/332/05.pdf | en_UK |
dc.rights | Publisher allows this work to be made available in this repository. Published in Yerbilimleri: Bulletin for Earth Sciences by Earth Science Application and Research Center of Hacettepe University with the following policy: The author or corresponding author on behalf of all authors (for papers with multiple authors) must sign the “Copyright Transfer” agreement before the article can be published. This transfer agreement enables the Earth Science Application and Research Center of Hacettepe University to protect the copyrighted material for the authors, but does not relinquish the authors’ proprietary rights. | en_UK |
dc.rights.uri | http://www.rioxx.net/licenses/under-embargo-all-rights-reserved | en_UK |
dc.subject | Analytical method | en_UK |
dc.subject | Immediate roof | en_UK |
dc.subject | Longwall mining | en_UK |
dc.subject | Numerical modeling | en_UK |
dc.subject | Roof weighting interval | en_UK |
dc.title | A Model for Determining the Breaking Characteristics of Immediate Roof in Longwall Mines | en_UK |
dc.type | Journal Article | en_UK |
dc.rights.embargodate | 3000-02-01 | en_UK |
dc.citation.jtitle | Yerbilimleri: An Earth Sciences Journal | en_UK |
dc.citation.issn | 1301-2894 | en_UK |
dc.citation.volume | 33 | en_UK |
dc.citation.issue | 2 | en_UK |
dc.citation.spage | 193 | en_UK |
dc.citation.epage | 204 | en_UK |
dc.citation.publicationstatus | Published | en_UK |
dc.citation.peerreviewed | Refereed | en_UK |
dc.type.status | VoR - Version of Record | en_UK |
dc.identifier.url | http://www.yerbilimleri.hacettepe.edu.tr/332/05.pdf | en_UK |
dc.author.email | sko1@stir.ac.uk | en_UK |
dc.contributor.affiliation | Islamic Azad University | en_UK |
dc.contributor.affiliation | Management, Work and Organisation | en_UK |
dc.contributor.affiliation | Islamic Azad University | en_UK |
dc.contributor.affiliation | Tarbiat Modares University | en_UK |
dc.contributor.affiliation | Islamic Azad University | en_UK |
dc.identifier.scopusid | 2-s2.0-84866281031 | en_UK |
dc.identifier.wtid | 761697 | en_UK |
dcterms.dateAccepted | 2012-03-31 | en_UK |
dc.date.filedepositdate | 2012-09-19 | en_UK |
rioxxterms.type | Journal Article/Review | en_UK |
rioxxterms.version | VoR | en_UK |
local.rioxx.author | Noroozi, Asghar| | en_UK |
local.rioxx.author | Oraee, Kazem| | en_UK |
local.rioxx.author | Javadi, Mehrdad| | en_UK |
local.rioxx.author | Goshtasbi, Kamran| | en_UK |
local.rioxx.author | Khodadady, Hosein| | en_UK |
local.rioxx.project | Internal Project|University of Stirling|https://isni.org/isni/0000000122484331 | en_UK |
local.rioxx.freetoreaddate | 3000-02-01 | en_UK |
local.rioxx.licence | http://www.rioxx.net/licenses/under-embargo-all-rights-reserved|| | en_UK |
local.rioxx.filename | Oraee05.pdf | en_UK |
local.rioxx.filecount | 1 | en_UK |
local.rioxx.source | 1301-2894 | en_UK |
Appears in Collections: | Management, Work and Organisation Journal Articles |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Oraee05.pdf | Fulltext - Published Version | 873.98 kB | Adobe PDF | Under Embargo until 3000-02-01 Request a copy |
This item is protected by original copyright |
Items in the Repository are protected by copyright, with all rights reserved, unless otherwise indicated.
The metadata of the records in the Repository are available under the CC0 public domain dedication: No Rights Reserved https://creativecommons.org/publicdomain/zero/1.0/
If you believe that any material held in STORRE infringes copyright, please contact library@stir.ac.uk providing details and we will remove the Work from public display in STORRE and investigate your claim.