Please use this identifier to cite or link to this item: http://hdl.handle.net/1893/3154
Full metadata record
DC FieldValueLanguage
dc.contributor.authorBakhtavar, Ezzeddinen_UK
dc.contributor.authorShahriar, Kouroshen_UK
dc.contributor.authorOraee, Kazemen_UK
dc.contributor.authorFlett, Peteren_UK
dc.contributor.editorSinghal, RKen_UK
dc.contributor.editorMehrotra, Aen_UK
dc.contributor.editorFytas, Ken_UK
dc.contributor.editorGe, Hen_UK
dc.date.accessioned2017-08-14T23:50:19Z-
dc.date.available2017-08-14T23:50:19Z-
dc.date.issued2009en_UK
dc.identifier.urihttp://hdl.handle.net/1893/3154-
dc.description.abstractDuring this paper, in order to identify the priority of consideration between the problems of “mining method selection” and “determining transition depth from open-pit to underground mining” an accurate procedure is introduced step by step. First, it is essential to specify if an ore deposit that potentially will have mined by a combined method of open-pit and underground mining. In this case, optimal final open-pit limit and depth must be initially determined. After that, if the rest of deposit below open-pit limit is economically considerable, it is necessary to select the most adequate underground method with emphasis on the high production rate and low cost methods. Then, it is necessary to determine optimal transition depth from open-pit to underground mining considering a crown pillar immediately below open-pit mining. Finally, the procedure with its algorithm was used for an iron ore deposit with the combined mining potential.en_UK
dc.language.isoenen_UK
dc.publisherReading Matrix, Inc.en_UK
dc.relationBakhtavar E, Shahriar K, Oraee K & Flett P (2009) Mining method selection and transition depth determination problems - which one is in priority of consideration?. In: Singhal R, Mehrotra A, Fytas K & Ge H (eds.) Proceedings of the 18th International Symposium on Mine Planning and Equipment Selection (MPES 2009) 18th International Symposium on Mine Planning and Equipment Selection (MPES), Banff, Alberta, Canada, 16.11.2009-19.11.2009. Calgary, Canada: Reading Matrix, Inc. pp. 67-74. http://www.mpes-cami-swemp.comen_UK
dc.rightsThe chair of the International Organizing Committee for the International Symposium on Mine Planning and Equipment Selection (MPES) has granted permission for use of conference papers in this Repository. The paper was first presented at the 18th International Symposium of Mine Planning and Equipment Selection.en_UK
dc.subjectMining method selectionen_UK
dc.subjecttransition depthen_UK
dc.subjectopen-piten_UK
dc.subjectundergrounden_UK
dc.subjectcombined miningen_UK
dc.subjectCoal mines and miningen_UK
dc.titleMining method selection and transition depth determination problems - which one is in priority of consideration?en_UK
dc.typeConference Paperen_UK
dc.citation.spage67en_UK
dc.citation.epage74en_UK
dc.citation.publicationstatusPublisheden_UK
dc.citation.peerreviewedRefereeden_UK
dc.type.statusVoR - Version of Recorden_UK
dc.identifier.urlhttp://www.mpes-cami-swemp.comen_UK
dc.author.emailsko1@stir.ac.uken_UK
dc.citation.btitleProceedings of the 18th International Symposium on Mine Planning and Equipment Selection (MPES 2009)en_UK
dc.citation.conferencedates2009-11-16 - 2009-11-19en_UK
dc.citation.conferencelocationBanff, Alberta, Canadaen_UK
dc.citation.conferencename18th International Symposium on Mine Planning and Equipment Selection (MPES)en_UK
dc.citation.isbn9781629932774en_UK
dc.publisher.addressCalgary, Canadaen_UK
dc.contributor.affiliationUrmia University of Technologyen_UK
dc.contributor.affiliationAmirkabir University of Technologyen_UK
dc.contributor.affiliationManagement, Work and Organisationen_UK
dc.contributor.affiliationManagement, Work and Organisationen_UK
dc.identifier.wtid819460en_UK
dcterms.dateAccepted2009-12-31en_UK
dc.date.filedepositdate2011-07-04en_UK
rioxxterms.typeConference Paper/Proceeding/Abstracten_UK
rioxxterms.versionVoRen_UK
local.rioxx.authorBakhtavar, Ezzeddin|en_UK
local.rioxx.authorShahriar, Kourosh|en_UK
local.rioxx.authorOraee, Kazem|en_UK
local.rioxx.authorFlett, Peter|en_UK
local.rioxx.projectInternal Project|University of Stirling|https://isni.org/isni/0000000122484331en_UK
local.rioxx.contributorSinghal, RK|en_UK
local.rioxx.contributorMehrotra, A|en_UK
local.rioxx.contributorFytas, K|en_UK
local.rioxx.contributorGe, H|en_UK
local.rioxx.freetoreaddate2011-07-04en_UK
local.rioxx.licencehttp://www.rioxx.net/licenses/all-rights-reserved|2011-07-04|en_UK
local.rioxx.filenamepriority.pdfen_UK
local.rioxx.filecount1en_UK
local.rioxx.source9781629932774en_UK
Appears in Collections:Management, Work and Organisation Conference Papers and Proceedings

Files in This Item:
File Description SizeFormat 
priority.pdfFulltext - Published Version404.19 kBAdobe PDFView/Open


This item is protected by original copyright



Items in the Repository are protected by copyright, with all rights reserved, unless otherwise indicated.

The metadata of the records in the Repository are available under the CC0 public domain dedication: No Rights Reserved https://creativecommons.org/publicdomain/zero/1.0/

If you believe that any material held in STORRE infringes copyright, please contact library@stir.ac.uk providing details and we will remove the Work from public display in STORRE and investigate your claim.