dc.description.abstractIn the evaluation of Sungun Copper Project (SCP), a pre-financing economic model was constructed and subsequently the model modified based on the latest and most reliable data. The Internal Rate of Return (IRR) of the base case including all costs is 9.04 percent. At a discount rate of 6.5 percent and copper price of $1,985/t, Net Present Value (NPV) of the Project is 910,875.54M.R. The breakeven copper price is $1,840/t. The financial model of Sungun Copper Project has the ability to show sensitivity of the project against any changes in estimation of important economic indicators such as copper price, capital, Reinvestment and operating expenditures, discount rate and exchange rate instantly. One can see that the most sensitive factor, as is usual in projects of this nature is copper price. Capital cost is slightly more influential than operating cost indicating that optimization of both parameters will be necessary to achieve a positive NPV at copper prices below $2,000/t.en_UK
dc.language.isofaen_UK
dc.relationBagheri V & Oraee K (2005) Songun Copper Project Economic Analysis and Sensitivity Analysis on Key Economic Parameters. In: The Second Iranian Surface Mining Conference, Kerman, Iran, 2005. Second Iranian Surface Mining Conference, 2005, Kerman, Iran.en_UK
dc.rightsAs far as we can ascertain there are no restrictions to prevent this work being made publicly available in this repository. If you are aware of any restrictions please contact us (library@stir.ac.uk) and we will immediately remove the work from public view.en_UK
dc.subjectNet Present Value (NPV)en_UK
dc.subjectInternal Rate of Return (IRR)en_UK
dc.subjectFinancial Modelen_UK
dc.titleSongun Copper Project Economic Analysis and Sensitivity Analysis on Key Economic Parametersen_UK
dc.typeConference Paperen_UK
dc.citation.publicationstatusPublisheden_UK
dc.type.statusAM - Accepted Manuscripten_UK
dc.author.emails.k.oraee-mirzamani@stir.ac.uken_UK
dc.citation.btitleThe Second Iranian Surface Mining Conference, Kerman, Iran, 2005en_UK
dc.citation.conferencelocationKerman, Iranen_UK
dc.citation.conferencenameSecond Iranian Surface Mining Conference, 2005en_UK
dc.citation.date31/12/2005en_UK
dc.contributor.affiliationIslamic Azad Universityen_UK
dc.contributor.affiliationManagement, Work and Organisationen_UK
dc.identifier.wtid598110en_UK
dcterms.dateAccepted2005-12-31en_UK
dc.date.filedepositdate2015-05-29en_UK
rioxxterms.typeConference Paper/Proceeding/Abstracten_UK
rioxxterms.versionAMen_UK
local.rioxx.authorBagheri, Vahid|en_UK
local.rioxx.authorOraee, Kazem|en_UK
local.rioxx.projectInternal Project|University of Stirling|https://isni.org/isni/0000000122484331en_UK
local.rioxx.freetoreaddate2015-05-29en_UK
local.rioxx.licencehttp://www.rioxx.net/licenses/all-rights-reserved|2015-05-29|en_UK
local.rioxx.filename2-IAU1.pdfen_UK
local.rioxx.filecount1en_UK
Appears in Collections:Management, Work and Organisation Conference Papers and Proceedings

Files in This Item:
File Description SizeFormat 
2-IAU1.pdfFulltext - Accepted Version305.25 kBAdobe PDFView/Open


This item is protected by original copyright



Items in the Repository are protected by copyright, with all rights reserved, unless otherwise indicated.

The metadata of the records in the Repository are available under the CC0 public domain dedication: No Rights Reserved https://creativecommons.org/publicdomain/zero/1.0/

If you believe that any material held in STORRE infringes copyright, please contact library@stir.ac.uk providing details and we will remove the Work from public display in STORRE and investigate your claim.