Please use this identifier to cite or link to this item: http://hdl.handle.net/1893/21706
Full metadata record
DC FieldValueLanguage
dc.contributor.authorOraee, Kazemen_UK
dc.contributor.authorBangian, Amir Houssainen_UK
dc.contributor.authorAbassi, Mohammaden_UK
dc.date.accessioned2016-12-29T02:35:05Z-
dc.date.available2016-12-29T02:35:05Z-
dc.date.issued2008en_UK
dc.identifier.urihttp://hdl.handle.net/1893/21706-
dc.description.abstractIn sublevel stoping method, production costs are comprised of development, stoping, loading and haulage, crushing and conveying, and lastly supervision and service. Among these divisions, stoping cost can be variable by reason of using different production drilling methods. Also development and stoping cost forms the main part of the operation's costs. Therefore identification of the efficient production drilling method greatly can be functional to decrease operation's costs. Relative efficiency consideration of production drilling methods is one of the helpful measures to recognize the efficient system in this respect. Accordingly in this paper production drilling methods of sublevel stoping which have highly appropriate performance and production rate are introduced. Subsequently different variation of a hypothesized production block's dimensions is assessed. Furthermore a Data Envelopment Analysis (DEA) model is generated through a hypothetical production block with dimension of 40 and 90 m in width and height respectively as a trial. The inputs of the model are the drilling costs and the operation times. As well the outputs are the volume and uniformity of the blasted ore. Finally the result has been concluded that, in different size of a production block relative efficiency of each feasible drilling method is not the same. Also it is shown that parallel drilling method has the highest rate of relative efficiency amongst the feasible drilling methods.en_UK
dc.language.isoenen_UK
dc.relationOraee K, Bangian AH & Abassi M (2008) Evaluation of the Relative Efficiency of Production Drilling Methods in Sublevel Stoping by DEA. In: Proceedings of the 17th International Symposium on Mine Planning and Equipment (MPES 2008) Seventeenth International Symposium on Mine Planning and Equipment, 2008, Beijing, China, 01.12.2008-03.12.2008. Beijing, pp. 170-183.en_UK
dc.rightsThe publisher has not yet responded to our queries therefore this work cannot be made publicly available in this Repository. Please use the Request a Copy feature at the foot of the Repository record to request a copy directly from the author. You can only request a copy if you wish to use this work for your own research or private study.en_UK
dc.rights.urihttp://www.rioxx.net/licenses/under-embargo-all-rights-reserveden_UK
dc.subjectSublevel Stopingen_UK
dc.subjectProduction Drillingen_UK
dc.subjectRelative Efficiencyen_UK
dc.subjectDEAen_UK
dc.subjectInput oriented envelopment CCR modelen_UK
dc.titleEvaluation of the Relative Efficiency of Production Drilling Methods in Sublevel Stoping by DEAen_UK
dc.typeConference Paperen_UK
dc.rights.embargodate3000-12-01en_UK
dc.rights.embargoreason[2-024-02-Oraee_Bangian_Abassi.pdf] The publisher has not yet responded to our queries. This work cannot be made publicly available in this Repository therefore there is an embargo on the full text of the work.en_UK
dc.citation.spage170en_UK
dc.citation.epage183en_UK
dc.citation.publicationstatusPublisheden_UK
dc.type.statusVoR - Version of Recorden_UK
dc.author.emails.k.oraee-mirzamani@stir.ac.uken_UK
dc.citation.btitleProceedings of the 17th International Symposium on Mine Planning and Equipment (MPES 2008)en_UK
dc.citation.conferencedates2008-12-01 - 2008-12-03en_UK
dc.citation.conferencelocationBeijing, Chinaen_UK
dc.citation.conferencenameSeventeenth International Symposium on Mine Planning and Equipment, 2008en_UK
dc.citation.date31/12/2008en_UK
dc.publisher.addressBeijingen_UK
dc.contributor.affiliationManagement, Work and Organisationen_UK
dc.contributor.affiliationIslamic Azad Universityen_UK
dc.contributor.affiliationIslamic Azad Universityen_UK
dc.identifier.wtid600018en_UK
dcterms.dateAccepted2008-12-31en_UK
dc.date.filedepositdate2015-04-27en_UK
rioxxterms.apcunknownen_UK
rioxxterms.typeConference Paper/Proceeding/Abstracten_UK
rioxxterms.versionVoRen_UK
local.rioxx.authorOraee, Kazem|en_UK
local.rioxx.authorBangian, Amir Houssain|en_UK
local.rioxx.authorAbassi, Mohammad|en_UK
local.rioxx.projectInternal Project|University of Stirling|https://isni.org/isni/0000000122484331en_UK
local.rioxx.freetoreaddate3000-12-01en_UK
local.rioxx.licencehttp://www.rioxx.net/licenses/under-embargo-all-rights-reserved||en_UK
local.rioxx.filename2-024-02-Oraee_Bangian_Abassi.pdfen_UK
local.rioxx.filecount1en_UK
Appears in Collections:Management, Work and Organisation Conference Papers and Proceedings

Files in This Item:
File Description SizeFormat 
2-024-02-Oraee_Bangian_Abassi.pdfFulltext - Published Version2.57 MBAdobe PDFUnder Embargo until 3000-12-01    Request a copy


This item is protected by original copyright



Items in the Repository are protected by copyright, with all rights reserved, unless otherwise indicated.

The metadata of the records in the Repository are available under the CC0 public domain dedication: No Rights Reserved https://creativecommons.org/publicdomain/zero/1.0/

If you believe that any material held in STORRE infringes copyright, please contact library@stir.ac.uk providing details and we will remove the Work from public display in STORRE and investigate your claim.