Please use this identifier to cite or link to this item: http://hdl.handle.net/1893/21704
Full metadata record
DC FieldValueLanguage
dc.contributor.authorMohammadi, Mousa-
dc.contributor.authorRai, Piyush-
dc.contributor.authorOraee, Kazem-
dc.contributor.authorKumar, Manish-
dc.date.accessioned2016-12-05T23:12:10Z-
dc.date.issued2013-
dc.identifier.urihttp://hdl.handle.net/1893/21704-
dc.description.abstractDue to operational advantage of dragline in simultaneous excavation and back-filling, the equipment has gained vast importance in open-pit mining. Besides, absence of auxiliary haulage units and a myriad of other benefits are also credited in favor of excavation of muck piles by the draglines. However, the aspects of production, productivity and economics are of utmost significance in dragline operation and planning. In this light, the present paper is an endeavor to analyze availability and utilization of dragline operations. The paper presents a good amount of data for 4-draglines operating in one of the major opencast projects in India. The study reveals the trends of availability and utilization of these draglines during last 11-years. Furthermore, the study also highlights the salient reasons for loss of available hours and for idling of the draglines. Some startling information and facts have been illustrated in form of graphs and pie charts.en_UK
dc.language.isoen-
dc.publisherWorld Mining Congress-
dc.relationMohammadi M, Rai P, Oraee K & Kumar M (2013) Analysis of Availability and Utilization of Dragline for Enhancement of Productivity in Surface Mines – A Case Study In: Proceedings of the 23rd World Mining Congress, Montreal, Katowice, Poland: World Mining Congress. 23rd World Mining Congress 2013, 11.8.2013 - 15.8.2013, Montreal, Canada.-
dc.rightsThe publisher has not yet responded to our queries therefore this work cannot be made publicly available in this Repository. Please use the Request a Copy feature at the foot of the Repository record to request a copy directly from the author. You can only request a copy if you wish to use this work for your own research or private study.-
dc.subjectProductivityen_UK
dc.subjectAvailabilityen_UK
dc.subjectUtilizationen_UK
dc.titleAnalysis of Availability and Utilization of Dragline for Enhancement of Productivity in Surface Mines – A Case Studyen_UK
dc.typeConference Paperen_UK
dc.rights.embargodate2999-12-31T00:00:00Z-
dc.rights.embargoreasonThe publisher has not yet responded to our queries. This work cannot be made publicly available in this Repository therefore there is an embargo on the full text of the work.-
dc.citation.publicationstatusPublished-
dc.type.statusAuthor Version-
dc.identifier.urlhttp://web.beun.edu.tr/maden/files/2013/05/wmc_2013.pdf-
dc.author.emails.k.oraee-mirzamani@stir.ac.uk-
dc.citation.btitleProceedings of the 23rd World Mining Congress, Montreal-
dc.citation.conferencedates2013-08-11T00:00:00Z-
dc.citation.conferencelocationMontreal, Canada-
dc.citation.conferencename23rd World Mining Congress 2013-
dc.citation.date08/2013-
dc.publisher.addressKatowice, Poland-
dc.contributor.affiliationBanaras Hindu University-
dc.contributor.affiliationBanaras Hindu University-
dc.contributor.affiliationManagement Work and Organisation-
dc.contributor.affiliationNorthern Coalfields Limited-
dc.rights.embargoterms2999-12-31-
dc.rights.embargoliftdate2999-12-31-
Appears in Collections:Management, Work and Organisation Conference Papers and Proceedings

Files in This Item:
File Description SizeFormat 
1-4.pdf420.67 kBAdobe PDFUnder Permanent Embargo    Request a copy


This item is protected by original copyright



Items in the Repository are protected by copyright, with all rights reserved, unless otherwise indicated.

If you believe that any material held in STORRE infringes copyright, please contact library@stir.ac.uk providing details and we will remove the Work from public display in STORRE and investigate your claim.