Please use this identifier to cite or link to this item: http://hdl.handle.net/1893/21658
Appears in Collections:Management, Work and Organisation Conference Papers and Proceedings
Author(s): Oraee, Kazem
Salehi, Bahram
Contact Email: s.k.oraee-mirzamani@stir.ac.uk
Title: Calculation Optimum Advance Rate and Productivity on TBM Tunneling- A case study in Iran
Citation: Oraee K & Salehi B (2011) Calculation Optimum Advance Rate and Productivity on TBM Tunneling- A case study in Iran. In: International Conference on Tunnelling & Trenchless Technology, Kuala Lumpur 1 – 3 March 2011. International Conference on Tunnelling & Trenchless Technology,, Kuala Lumpur, Malaysia, 01.03.2011-03.03.2011. Kuala Lumpur: The Institution of Engineers - Malaysia.
Issue Date: 2011
Date Deposited: 16-Apr-2015
Conference Name: International Conference on Tunnelling & Trenchless Technology,
Conference Dates: 2011-03-01 - 2011-03-03
Conference Location: Kuala Lumpur, Malaysia
Abstract: Productivity and profitability have been previously noticeable subjects for classic economists. Nowadays, optimization and productivity are main challenges of industry and development. It is estimated that drinkable water consumption in Tehran city will increase during the next 25 years. In order to decrease probable crisis and to prevent lack of water in the future, many projects have been designed and executed. Karaj-Tehran water supply tunnel is a sample of these projects. In this paper, optimum advance rate will calculate through economical view and productivity. Optimum advance rate is calculated for Hara Co (Contractor) according to fix and variable costs. In the conclusion, it was observed that slope of the cost graph is nearly horizontal and the advance rate is between 1200 to 1500 meters per month. Therefore, decrease in graph and also productivity increases by means of advance rate are not noticeable. According to current advancement of the tunnel, (average 400 meters per month) if the project is finished within 35 to 40 months, total productivity will be 1.07 to 1.09. Hence, the contractor will achieve an interest of 9% at maximum.
Status: AM - Accepted Manuscript
Rights: As far as we can ascertain there are no restrictions to prevent this work being made publicly available in this repository. If you are aware of any restrictions please contact us (library@stir.ac.uk) and we will immediately remove the work from public view.

Files in This Item:
File Description SizeFormat 
2-calculation-optimum-advance-rate.pdfFulltext - Accepted Version741.45 kBAdobe PDFView/Open



This item is protected by original copyright



Items in the Repository are protected by copyright, with all rights reserved, unless otherwise indicated.

The metadata of the records in the Repository are available under the CC0 public domain dedication: No Rights Reserved https://creativecommons.org/publicdomain/zero/1.0/

If you believe that any material held in STORRE infringes copyright, please contact library@stir.ac.uk providing details and we will remove the Work from public display in STORRE and investigate your claim.