Please use this identifier to cite or link to this item:
http://hdl.handle.net/1893/21639
Full metadata record
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Mohammadi, Mousa | en_UK |
dc.contributor.author | Rai, Piyush | en_UK |
dc.contributor.author | Oraee, Kazem | en_UK |
dc.date.accessioned | 2018-01-25T07:22:44Z | - |
dc.date.available | 2018-01-25T07:22:44Z | - |
dc.date.issued | 2015-08 | en_UK |
dc.identifier.uri | http://hdl.handle.net/1893/21639 | - |
dc.description.abstract | Dragline is highly capital intensive equipment to procure, operate and maintain in any surface mining operation. Given this, every second of operation of this capital intensive equipment is absolutely important. As such, it is imperative to optimize the overall cycle time of this equipment in order to reap the benefits of this equipment to the fullest extent. Even a small improvement in the total cycle time has a significant influence on the overall performance of machine. In this light, the present paper is an endeavour to critically analyze digging time segment of dragline operations. The paper presents real-time data for a dragline operating in one of the major opencast projects in India. Investigation indicates the influence of cutting depth, dimensions and geometry of the cut area, nature of material, degree of fragmentation and operator's skills on the digging segment of dragline cycle time. Results have been illustrated in the form of figures, graphs and tables. | en_UK |
dc.language.iso | en | en_UK |
dc.publisher | Springer | en_UK |
dc.relation | Mohammadi M, Rai P & Oraee K (2015) A Critical Investigation of Digging Time Segment of Draglines in a Large Surface Mine. Geotechnical and Geological Engineering, 33 (4), pp. 763-771. https://doi.org/10.1007/s10706-015-9857-9 | en_UK |
dc.rights | The publisher does not allow this work to be made publicly available in this Repository. Please use the Request a Copy feature at the foot of the Repository record to request a copy directly from the author. You can only request a copy if you wish to use this work for your own research or private study. | en_UK |
dc.rights.uri | http://www.rioxx.net/licenses/under-embargo-all-rights-reserved | en_UK |
dc.subject | Digging time | en_UK |
dc.subject | Dragline cuts | en_UK |
dc.subject | Re-handling area | en_UK |
dc.subject | Degree of fragmentation | en_UK |
dc.subject | Surface mine | en_UK |
dc.title | A Critical Investigation of Digging Time Segment of Draglines in a Large Surface Mine | en_UK |
dc.type | Journal Article | en_UK |
dc.rights.embargodate | 2999-12-19 | en_UK |
dc.rights.embargoreason | [Mohammadi et al_Geotech Geol Eng_2015.pdf] The publisher does not allow this work to be made publicly available in this Repository therefore there is an embargo on the full text of the work. | en_UK |
dc.identifier.doi | 10.1007/s10706-015-9857-9 | en_UK |
dc.citation.jtitle | Geotechnical and Geological Engineering | en_UK |
dc.citation.issn | 1573-1529 | en_UK |
dc.citation.issn | 0960-3182 | en_UK |
dc.citation.volume | 33 | en_UK |
dc.citation.issue | 4 | en_UK |
dc.citation.spage | 763 | en_UK |
dc.citation.epage | 771 | en_UK |
dc.citation.publicationstatus | Published | en_UK |
dc.citation.peerreviewed | Refereed | en_UK |
dc.type.status | VoR - Version of Record | en_UK |
dc.author.email | s.k.oraee-mirzamani@stir.ac.uk | en_UK |
dc.citation.date | 18/02/2015 | en_UK |
dc.contributor.affiliation | Banaras Hindu University | en_UK |
dc.contributor.affiliation | Banaras Hindu University | en_UK |
dc.contributor.affiliation | Management, Work and Organisation | en_UK |
dc.identifier.isi | WOS:000358142900001 | en_UK |
dc.identifier.scopusid | 2-s2.0-84923034036 | en_UK |
dc.identifier.wtid | 601112 | en_UK |
dc.date.accepted | 2015-02-05 | en_UK |
dcterms.dateAccepted | 2015-02-05 | en_UK |
dc.date.filedepositdate | 2015-04-02 | en_UK |
rioxxterms.apc | not required | en_UK |
rioxxterms.type | Journal Article/Review | en_UK |
rioxxterms.version | VoR | en_UK |
local.rioxx.author | Mohammadi, Mousa| | en_UK |
local.rioxx.author | Rai, Piyush| | en_UK |
local.rioxx.author | Oraee, Kazem| | en_UK |
local.rioxx.project | Internal Project|University of Stirling|https://isni.org/isni/0000000122484331 | en_UK |
local.rioxx.freetoreaddate | 2999-12-19 | en_UK |
local.rioxx.licence | http://www.rioxx.net/licenses/under-embargo-all-rights-reserved|| | en_UK |
local.rioxx.filename | Mohammadi et al_Geotech Geol Eng_2015.pdf | en_UK |
local.rioxx.filecount | 1 | en_UK |
local.rioxx.source | 0960-3182 | en_UK |
Appears in Collections: | Management, Work and Organisation Journal Articles |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
Mohammadi et al_Geotech Geol Eng_2015.pdf | Fulltext - Published Version | 1.4 MB | Adobe PDF | Under Embargo until 2999-12-19 Request a copy |
This item is protected by original copyright |
Items in the Repository are protected by copyright, with all rights reserved, unless otherwise indicated.
The metadata of the records in the Repository are available under the CC0 public domain dedication: No Rights Reserved https://creativecommons.org/publicdomain/zero/1.0/
If you believe that any material held in STORRE infringes copyright, please contact library@stir.ac.uk providing details and we will remove the Work from public display in STORRE and investigate your claim.