dc.contributor.author | Bakhtavar, Ezzeddin | en_UK |
dc.contributor.author | Shahriar, Kourosh | en_UK |
dc.contributor.author | Oraee, Kazem | en_UK |
dc.date.accessioned | 2013-08-02T23:47:40Z | - |
dc.date.available | 2013-08-02T23:47:40Z | en_UK |
dc.date.issued | 2009-09 | en_UK |
dc.identifier.uri | http://hdl.handle.net/1893/2045 | - |
dc.description.abstract | There are many deposits that have the potential to be mined by a combined method of open-pit and underground. In this manner, the most sensitive problem is the determination of the optimal transition depth from open-pit to underground or vice versa. To calculate this depth, a model based on block economic values of open-pit and underground methods together with the Net Present Value (NPV) attained through mining is first presented. During the model, NPV of open-pit is compared to the value of underground for the similar levels. A hypothetical example is used in order to analyze the model in detail. Based on the assumptions made such as: a discount rate of 15 %, each pair of contiguous level-cuts have to mine during one year, and one level as the height of crown pillar, the optimal transition depth was determined to be equal to 62.5 m. Then, level 6 was considered as the suitable crown pillar. Finally, maximum total NPV of the combined mining was calculated to be 25.54 units of currency | en_UK |
dc.language.iso | en | en_UK |
dc.publisher | Springer | en_UK |
dc.relation | Bakhtavar E, Shahriar K & Oraee K (2009) Transition from open-pit to underground as a new optimization challenge in mining engineering. Journal of Mining Science, 45 (5), pp. 485-494. https://doi.org/10.1007/s10913-009-0060-3 | en_UK |
dc.rights | The publisher does not allow this work to be made publicly available in this Repository. Please use the Request a Copy feature at the foot of the Repository record to request a copy directly from the author; you can only request a copy if you wish to use this work for your own research or private study. | en_UK |
dc.rights.uri | http://www.rioxx.net/licenses/under-embargo-all-rights-reserved | en_UK |
dc.subject | Transition depth | en_UK |
dc.subject | optimization challenge | en_UK |
dc.subject | open-pit | en_UK |
dc.subject | underground | en_UK |
dc.subject | discount rate | en_UK |
dc.subject | NPV | en_UK |
dc.subject | Mining engineering | en_UK |
dc.subject | Strip mining | en_UK |
dc.title | Transition from open-pit to underground as a new optimization challenge in mining engineering | en_UK |
dc.type | Journal Article | en_UK |
dc.rights.embargodate | 2999-12-31 | en_UK |
dc.rights.embargoreason | [4-transition from open-pit.pdf] The publisher does not allow this work to be made publicly available in this Repository therefore there is an embargo on the full text of the work. | en_UK |
dc.identifier.doi | 10.1007/s10913-009-0060-3 | en_UK |
dc.citation.jtitle | Fiziko-Tekhnicheskie Problemy Razrabotki Poleznykh Iskopaemykh / Journal of Mining Science | en_UK |
dc.citation.issn | 1573-8736 | en_UK |
dc.citation.issn | 1062-7391 | en_UK |
dc.citation.volume | 45 | en_UK |
dc.citation.issue | 5 | en_UK |
dc.citation.spage | 485 | en_UK |
dc.citation.epage | 494 | en_UK |
dc.citation.publicationstatus | Published | en_UK |
dc.citation.peerreviewed | Refereed | en_UK |
dc.type.status | VoR - Version of Record | en_UK |
dc.author.email | s.k.oraee-mirzamani@stir.ac.uk | en_UK |
dc.contributor.affiliation | Urmia University of Technology | en_UK |
dc.contributor.affiliation | Amirkabir University of Technology | en_UK |
dc.contributor.affiliation | Management, Work and Organisation | en_UK |
dc.identifier.isi | WOS:000272573800009 | en_UK |
dc.identifier.scopusid | 2-s2.0-72849118487 | en_UK |
dc.identifier.wtid | 818960 | en_UK |
dcterms.dateAccepted | 2009-09-30 | en_UK |
dc.date.filedepositdate | 2010-02-17 | en_UK |
rioxxterms.type | Journal Article/Review | en_UK |
rioxxterms.version | VoR | en_UK |
local.rioxx.author | Bakhtavar, Ezzeddin| | en_UK |
local.rioxx.author | Shahriar, Kourosh| | en_UK |
local.rioxx.author | Oraee, Kazem| | en_UK |
local.rioxx.project | Internal Project|University of Stirling|https://isni.org/isni/0000000122484331 | en_UK |
local.rioxx.freetoreaddate | 2999-12-31 | en_UK |
local.rioxx.licence | http://www.rioxx.net/licenses/under-embargo-all-rights-reserved|| | en_UK |
local.rioxx.filename | 4-transition from open-pit.pdf | en_UK |
local.rioxx.filecount | 1 | en_UK |
local.rioxx.source | 1062-7391 | en_UK |
Appears in Collections: | Management, Work and Organisation Journal Articles |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
4-transition from open-pit.pdf | Fulltext - Published Version | 278.56 kB | Adobe PDF | Under Permanent Embargo Request a copy |
This item is protected by original copyright |
Items in the Repository are protected by copyright, with all rights reserved, unless otherwise indicated.
The metadata of the records in the Repository are available under the CC0 public domain dedication: No Rights Reserved https://creativecommons.org/publicdomain/zero/1.0/
If you believe that any material held in STORRE infringes copyright, please contact library@stir.ac.uk providing details and we will remove the Work from public display in STORRE and investigate your claim.